T-Time Magazine
T-Time is the magazine for Trelleborg's customers, shareholders
and other
interest groups

Download T-Time





Latest News

29 July 2010

Mine Site Parking Bay System

In conjunction with a major Iron Ore producer TRELLEBORG has designed and manufactured a heavy duty transportable parking bay system for heavy equipment nicknamed the "Anaconda."   The Anaconda is extruded from a tough, wear resistant, UV protected rubber. The Anaconda can be easily be towed to remote areas of a mine site which allows heavy mobile equipment to be safely parked when not in use.

Enquire Now

 

15 July 2010

Trommel Panels for SAG Mill

Trommel panels waiting to be fitted to a SAG and Ball mill. SAG and ball mills are used on mining sites to crush the ore. The customers comment -- "A perfect fit"

Enquire Now

 

25 June 2010

Fendering for Pilot Boat

Trelleborg provide a light weight profile fender for Pilot Boat serving North Queensland Shipping.

Enquire Now

 

31 May 2010

Gripper Rings for Offshore Barge

Trelleborg Engineered Systems Australia has supplied 48 Gripper Ring systems for an offshore jack-up barge. The four legs are held in place by pneumatically inflated bladders. The gripping force generated by the pneumatic bladders forcing rubber gripper rings against the 1800mm diameter pile. The clamping force between the piles and barge, allows the barges hydraulic jacking system to be re- indexed for the next lift. The barge is lifted above sea level supported by the piles to provide a stable offshore work platform not influenced by waves and tide.

Enquire Now

 

24 May 2010

Orkot® composite bearings

Trelleborg Engineered Systems now offer composite bearings and thermoplastic bearings for a wide range of applications. Polymer bearings, such as our Orkot®, offer significant advantages over traditional metal bearings. All are dimensionally stable, have excellent wear resistance and outstanding low-friction characteristics, giving them unrivalled performance in dry or with boundary lubrication. Orkot® composite bearings have virtually no swell in seawater, making them ideal for marine and hydropower applications. Their superior elasticity over metal bearings means they can take edge-loading and counter misalignment even under extremely heavy loads.

Enquire Now

 

19 May 2010

Kununara Dam Seals

The Kununara Diversion Dam, a part of the Ord River Project, was recently upgraded with special key style profile seals to ensure the water tightness of the stop logs. Trelleborg specializes in the supply and manufacture of specialty seals for Dam gates, irrigation channels and water storage applications using music note, keyhole hump, lipped and Omega seals.

Enquire Now

 

18 May 2010

Defence Recognised Supplier

Trelleborg Engineered Systems Australia has recently been listed on the Defence Recognised Supplier Scheme by the Australian Defence Organisation. The ADO is a very demanding customer that uses some of the most technologically advanced and high quality products and services currently available. It is critical that the products and services supplied to the ADO are delivered on time, on budget and are fit for the purpose for which they are acquired. A company that is granted use of the DRSS logo has demonstrated that it is able to deliver products or services that meet the ADO’s stringent standards.

Enquire Now

 

18 May 2010

BHP Worsley

Large aluminium plant in Western Australia. BHP/Bechtel has purchased 40 of our new anti-uplift structural slide bearings for various conveyor gantries and other steel infrastructure. Trelleborg are now in the process of testing the next design generation of this bearing. The new design will provide longer service life and will have a reduced plan area and thickness.

Enquire Now

 

18 May 2010

Geelong Section 4

The last section of the Geelong bypass project is now being installed! Trelleborg are presently supplying the contractor Fulton Hogan, over 150 metres of our new SSA-100 aluminium strip seal bridge expansion joint system, being for all the bridges on this project.

Enquire Now

 

23 March 2010

RTA Approval

Trelleborg has received RTA approval for our full range of plain and laminated rubber bridge bearings, after a lengthy and thorough review process.

Enquire Now

 

27 November 2009

Trelleborg's 'Virgin Rubber' Rail Crossing Released

Trelleborg's newly enhanced "Virgin Rubber" Rail Crossing finds it's way into the Australian market. With approvals to 140km/h for B-Double trucks, 100% virgin rubber and our unique locking design (Field & Gauge) there is no comparison when serviceability and performance are vital. Trelleborg crossings have recently been installed at Calwalla (Photo attached) and Carrick in N.S.W.

Enquire Now

 

11 May 2009

Trelleborg Receive First Order for MUFF Mining Hose.

We have received and dispatched our first order for MUFF Mining Hose under the Iluka contract with a second order already received. Perth now stock a complete range of MUFF hose ranging in size from 50mm - 300mm diameter. Contact: Collin Turnbull 0432 591 373

Enquire Now

 
E-mail this pagex


Receiver e-mail address


Your e-mail address


Subject


Your message